This week at Campbell's Corner

Works for this week include:

Ground Floor

  • Toilet fixtures installation continuing; and
  • Tiling continuing.

1st Floor

  • Painting continuing;
  • Air-conditioning continuing; and
  • Electrical rough-in continuing.

External

  • Painting to external facades continuing. 

Please note a 200 tonne crane will be onsite from 7am for approximately 6 hours installing air-conditioning ducts on roof.