11 January 2016

This week at Upper Hunter Tertiary Education Campus

The following work planned this week:

  • Landscaping;
  • Painting;
  • Final roofing works; and
  • Air-conditioning.

This week at Campbell's Corner Refurbishment

Works for this week include:

On Wednesday is the installation of the awning columns along Bridge St. One road lane will be closed to allow the use of a Hiab truck. Traffic control will be in place from 9.30am to 3.00pm.

On Thursday this work will continue along Brook St.

Ground Floor

  • Toilet fixtures installation continuing; and
  • Tiling continuing including entrances.

1st Floor

  • Painting continuing;
  • Air-conditioning continuing;
  • Electrical rough-in continuing; and
  • Carpet is being laid.

External

  • Painting to external facades continuing.