This week at Campbell's Corner

Works for this week include:

Concrete

  • Forming and pouring concrete columns to ground floor;
  • Forming and pouring footings to ground floor;
  • Expect concrete trucks Thursday/Friday;

Demolition

  • Remaining demolition to the Greater;
  • Removal of awning fascia;
  • Demolition of existing safe – this will be noisy work;

Blockwork

  • Ongoing Blockwork to ground floor area;

Services

  • Stormwater and hydraulic services to be installed to carpark. This will involve night works (6pm to 6am) and partial closure of car park;
  • First floor rough ins of services – ongoing;

Carpentry

  • Remaining floor works to the first floor; and

Linings

  • Walls and ceiling framing to commence to the first floor.

 

This week at Upper Hunter Tertiary Education Centre

The following work is planned for this week:

  • Continue formwork for level 1;
  • Structural block work to continue to internal and external walls; and
  • Upper forecourt sub grade works.

The site is now more weatherproof with a solid base for concrete pumps, crane etc. and now parked on site is a street sweeper which is being used frequently to keep the street free from mud.

21 May 2015

This week at Campbells Corner

Works for this week include: 

  • Concrete pour scheduled for Tuesday, pump will be set up in the construction compound but concrete trucks will be moving through the rear carpark. Traffic management will be in place. Forming of Concrete columns for rest of week;
  • Blockwork to commence on ground floor;
  • Night works happening towards end of week to install pipework through carpark to new pump house location;
  • Electrical rough ins to continue;
  • Temporary fencing erected around the location of the new pump house location and excavation of material to prepare for new slab;
  • Demolition of remaining ground floor areas; and
  • Remaining timber floor joists to be installed on first floor followed by fibre cement sheets.

Upper Hunter Tertiary Education Centre

The following work is planned for this week:

  • Commence perimeter scaffold for first floor;
  • Continue block work to structural walls between ground and first floor;
  • Continue framing to allow for form work for first floor;
  • Tie and place reinforcing to columns between ground floor and first floor.

A new site storage area is being established adjacent to the Hill St car park entry on the right hand side. This is not expected to affect the overall availability of car parking. For reference construction parking is limited to directly in front of the construction site offices on Hill St away from parking for the library and Hill St businesses.

7th April 2015

TERTIARY EDUCATION CAMPUS

Works for this week will include:

  • Formwork to stand alone columns on lower ground floor for block work to follow;
  • Completion of lower ground floor footings and pile caps;
  • Strip, waterproof and backfill to lift pit; and
  • Continue to export fill from site from footing excavation.

CAMPBELL'S CORNER

While tenants of Campbell’s Corner will be communicated with frequently about the works the intention of this update is to keep neighbouring businesses informed on works scheduled for the week ahead.  

Works for the week ahead will include:

  • Demolition of roof and concrete to mall;
  • Roofing works to the first floor;
  • Electrical/phone works for tenancies;
  • Carpentry floor works to first floor;
  • Brickwork to first floor; and
  • Concrete works to new Building 

The concrete work this week is set up but next week we do expect some vehicle traffic.

13th April 2015

This week at Campbell's Corner

While tenants of Campbell’s Corner will be communicated with frequently about the works the intention of this email is to keep neighbouring businesses informed on works scheduled for the week ahead.  

Works for the week ahead will include:

Demolition

  • Removal of roof beams to centre court,
  • Removal of concrete floor to centre court,
  • Removal of tiles to centre court, and
  • Please note these works will create significant noise. Works will be at staggered times as best as possible to give breaks in noise.

 Concrete Works

  • Bored Piers under way - please expect concrete trucks later in the week. These will operate from the carpark area and not affect Brook Street traffic, and
  • Footings to be formed for new building and staircase.

Carpentry Works

  • Continued works to the first floor flooring.

Roofing Works

  • Continued works to the re-roofing of existing building.

 

This week at the Tertiary Education Campus

Works for this week will include:

  • Pour remaining LGF footings Monday;
  • Commence earthworks to UGF pad;
  • Commence block work to lift shaft and stair towers; and
  • May commence framing for formwork.

Please note we will have a few large deliveries of blocks next week, which we will be unloading off semi-trailers with our telescopic handler which is now on site full time. The first delivery is expected to be on Monday, with more to come in the following days.

30 March 2015

TERTIARY EDUCATION CAMPUS:

Works for this week will include:

  • Completion of in ground stormwater and drainage works to upper and lower ground levels (stormwater discharge works to be completed in future works);
  • Excavation of footings to upper and lower levels; and
  • Tying steel and pouring concrete to footings, pile caps and lift base/walls.

Please note there will be some heavy vehicle activity coming in and out the site during the week, mainly consisting of concrete truck and concrete pumps. 

 

CAMPBELL'S CORNER UPDATE:

The severed Telstra cable has been replaced and services restored. This was isolated to Campbell’s Corner building.

Works for the week ahead will include:

  • Demolition works to the mall structure (beams & columns);
  • Demolition works to concrete floor of mall;
  • Roof replacements to Atherston and meeting rooms on first floor;
  • Carpentry – Installing floor joists to first floor; and
  • Concrete bored piers to commence towards end of week.

 It is a short week next week with Good Friday and then again on the following week with Easter Monday and an Industry RDO on Tuesday.

 